For the first H0ME house, we choose hemp shiv against written criteria, because an uneven batch makes the lime-hemp mix harder to prepare consistently. So we look at who produces the shiv, how it's processed, how much moisture it carries and how far it travels.

Hemp takes in CO₂ while it grows, and that plant carbon stays in the walls for as long as the house is in use. As an estimate, about 150 kg of CO₂ per m³ of biocomposite, held as contained carbon (94 kg of dry shiv per m³ × 1.6 kg CO₂/kg). That is not a climate balance for the house.

H0ME is the General Contractor bringing the HES system to Italy. Choosing the shiv supplier is a technical step, and it happens before the site opens, not during construction.

What the shiv has to meet before it reaches the site

For the first H0ME house, the shiv spec is in writing: cleanliness, particle size, moisture and origin.

Clean means no dust and no leftover fiber. The shiv arrives dedusted, so the lime mix starts from a clean, recognizable aggregate.

Next is particle size, meaning how big the pieces are. It has to suit the mix and the way it's placed. The supplier declares it, and we check it on a sample, batch by batch.

Moisture gets declared too, because it sets how much water goes into the mix. If it shifts between batches, the water has to be adjusted on site, and every last-minute fix adds one more variable.

Last, intact packaging and proper storage: the supplier should be able to explain how the material is kept and shipped.

These requirements shape how the mix is prepared, and they connect to how the HES mix works. That's why a supplier is qualified batch by batch, not once.

The check before anything gets signed

Before approving a producer, we ask for a sample from the batch and the technical sheet for that delivery, not the generic catalog sheet. The sample is compared with the mix parameters. If it falls outside them, it's rejected or sent back for reprocessing.

The check is planned for every delivery, to confirm each batch meets what was agreed. A uniform batch helps keep mix preparation steady.

We also ask for traceability: field of origin, harvest, processing and batch number. If a sack causes trouble, you can trace it back to where it came from.

Then there's distance. A nearby supplier means shorter hauls and deliveries, and lets us visit the processing site and repeat the checks in person. The logistics radius carries the same weight as quality.

Finally, it all goes in writing. Requirements, approved sample and each batch's technical sheet go into the site file.

What it means for the people who live there

A steady, well-graded aggregate gives an even base to work on, and a breathable wall is one reason people choose lime-hemp, for how it handles indoor humidity. For the people living in the house, it means work done with method: declared materials, documented checks, a path you can retrace.

What a house costs comes down mostly to its finishes. So every project gets its own quote after a site visit, and the first consultation is free.

Why it pays to work this way from day one

Checking every batch can seem like wasted time with a trusted supplier, but trust comes after the checks. HES data point to up to Class A4 with 35 cm in Zone D, to be verified on each project. The HES system has a European network of builders behind it; an Italian General Contractor has to bring the same discipline to every supply, starting with whoever provides the hemp shiv.

📌 About 150 kg of CO₂ per m³ of biocomposite, as plant carbon held in the material (estimate: 94 kg of dry shiv/m³ × 1.6 kg CO₂/kg). It is not a climate balance for the house.

FAQ

Is hemp shiv for green building an agricultural by-product or a calibrated raw material?
For the first H0ME house we treat it as a calibrated raw material: dedusted, with declared particle size and moisture.

How much does the producer's distance matter?
It affects delivery times and whether we can visit the processing site and repeat the checks in person.

How do you check technical compliance across different batches?
The plan is to ask for a sample, technical sheet and traceability for every batch, compared with the mix parameters before the pour is authorized.

The Technology page explains how these checks feed into the HES mix and how the whole system works. The previous article in the series covered the thermal bridge.


Article produced with the support of artificial intelligence and reviewed by the H.0.ME. editorial team.